To anchor a greenhouse on an exposed site, lay a level, well-drained base, fix that base firmly into the ground with anchors that suit your surface, and then bolt the greenhouse frame to it. These three layers work together, so if any one of them is weak, the wind will find it.
On an open lot, how a greenhouse is fixed down matters as much as how sturdy it is. Most greenhouse failures come from poor installation rather than extreme weather, and a greenhouse often stays in one piece while its base or anchors give way, leaving the whole structure shifted out of place.[1] In Canada, freezing and thawing ground adds one more test, because it can loosen fixings that were tight in the fall.
The same nine steps work for most backyard greenhouses, from film-covered tunnels to polycarbonate walk-ins.
What You’ll Need
Gather these before you start, so the base can go down in one session.
- Tape measure, string line and marker stakes
- Spirit level and a long, straight board
- Spade and a hand tamper or plate compactor
- Compactable granular fill, such as crushed gravel
- Anchors suited to your surface, plus any brackets or guy ropes
- Sledgehammer or post driver for stakes and rebar
- Drill, socket set and wrench
9 Steps to Anchor a Greenhouse on an Open Site
Work through the steps in order. Each one relies on the one before it, so skipping ahead often means redoing work later.
Step 1: Pick the Most Sheltered Spot You Have
Even on an open lot, some spots take less wind than others. Look for the sheltered side of a house, garage, fence or mature hedge, and avoid narrow gaps between buildings, which can funnel wind. Keep in mind that a deciduous hedge loses much of its shelter once the leaves drop.
Drainage matters as much as shelter. New Brunswick’s guidance for larger tunnels points growers to sites that are sheltered from the wind and well drained.[2] Leave clear ground around the footprint as well, so anchors and guy ropes can be set outside the corners later.
Step 2: Choose a Base That Suits the Ground

The base is what the frame bolts to and what the anchors hold down, so choose it for the ground and for how long the greenhouse will stay.[1]
| Base type | Strengths | Weaknesses | Best for |
| Levelled ground with compacted granular fill | Drains well, costs least, easy to clear away later | Least resistance to uplift | Tunnels and seasonal greenhouses |
| Perimeter base of treated timber or concrete | Keeps the frame square, leaves soil open for planting | Needs its own fixing into the ground | Walk-in greenhouses on open lots |
| Concrete slab or paving | Most stable of the three, with a clean working floor | Rules out planting in the ground | Permanent greenhouses on prepared ground |
On an open lot, a perimeter base is usually the best balance, because it gives the anchors a continuous edge to hold along every side.
Step 3: Match the Anchors to the Surface
The surface under the base decides the fixing.[1]
| Surface | Fixings that suit it | What to watch |
| Soil or grass | Ground stakes, rebar, screw anchors, guy ropes | Grip weakens in saturated or thawing ground |
| Gravel over compacted fill | Longer anchors driven through the fill into the soil below | Gravel alone gives anchors little grip |
| Paving slabs or concrete | Expansion bolts, metal brackets, base plate anchors | The slab must be sound and thick enough to drill |
| Timber deck | Brackets fixed through to the joists, ropes tied to structural points | Deck boards alone are not a fixing point |
On soil, rebar anchors are commonly driven about 18 inches into the ground, with side anchors spaced roughly every 3 feet along a tunnel.[3] Stony ground can make screw anchors hard to install, so check the site before buying them.[2]
It also pays to check what your kit includes, since the supplied hardware varies across Walk In Greenhouses and Tunnel Greenhouses. One polycarbonate walk-in comes with a galvanized steel base and four 4.7-inch (12 cm) ground bolts,[4] while a PE-covered walk-in relies on large foot plates, 12 ground stakes and 6-inch cover edges to bury.[5]
Step 4: Mark Out and Square the Footprint

A square footprint lets the base rails, panels and doors line up without forcing.
- Set a marker stake at each corner.
- Run a string line between the stakes.
- Measure both diagonals and adjust the stakes until the two figures match, which means the layout is square.[3]
Step 5: Strip, Fill and Level the Ground
A firm, level surface stops the base settling unevenly and pulling the frame out of square.
- Remove the sod and loose topsoil where the base will sit, since both settle under load.
- Spread granular fill in thin layers and compact each one, so the base sits firm and water drains through rather than pooling beneath it.
- On a slope, cut into the high side as well as filling the low side, rather than raising one end on deep fill.
- Check that the surface is level in both directions with a spirit level on a straight board.
On existing paving or a deck, skip the digging and check that the surface is level and sound instead.
Step 6: Lay the Base and Fix It Down

This is where the base is tied into the ground.
- Set the base on the prepared ground and check it for level again in both directions.
- Add or remove fill under any high or low spots.
- Fix it down along every side rather than only at the corners, so the middle of a long side cannot lift first.
- Set each anchor vertically, since one angled to clear a stone loses depth and leaves that part of the base weaker.
Step 7: Bolt the Frame to the Base
Wind tests the frame as well as the ground fixings,[1] so the frame needs fixing firmly to the base.
- If your kit has its own metal base, fix that down first and build the frame on it.
- Bolt the base plates, corner posts and side rails at regular spacing, so no section can lift on its own.
- Leave the bolts slightly loose, check that the frame’s diagonals match as in Step 4, then tighten them all.
Step 8: Add Uplift Anchors and Seal the Edges

On an open lot, set deep ground anchors or guy ropes just outside the corners and tie them back to the frame to take the lifting force. On a tunnel or other film-covered greenhouse, bury the extended cover edges in soil so wind cannot get underneath.[1][5]
Step 9: Recheck the Fixings Through the Year
After the spring thaw, while the ground is still soft enough to work, walk the perimeter, retighten the bolts and reset any stake that has lifted. Check again after any major windstorm, so one loose fixing does not shift the load onto the next.
How Deep Should Greenhouse Anchors Go in Canada?
Usually deeper than the bolts supplied with a kit, especially on an exposed site. These published Canadian examples, mostly from larger tunnels in New Brunswick and Manitoba, show the range.[2][6]
| Structure | Fixing | Depth or length |
| Caterpillar tunnel, New Brunswick | ½-inch rebar, 30 inches long | 18 inches in the ground |
| Multi-bay tunnel, New Brunswick | Screw-type ground posts | 3.5 feet below the surface |
| High tunnel end walls, Manitoba | ½-inch rebar | 5 feet long |
| Backyard polycarbonate walk-in kit | Supplied ground bolts | 4.7 inches (12 cm)[4] |
Frost depth matters too. Vancouver’s by-law, for example, exempts non-masonry, one-storey accessory buildings of up to 55 m² from its frost-depth foundation rule,[7] so a backyard greenhouse base usually sits above the frost line and can shift slightly over winter. Keep the base well drained, and ask your municipal building department for the frost depth at your address.
Common Anchoring Mistakes on Open Lots
Watch for these two in particular.
- Expecting a heavier frame to stop a greenhouse that keeps moving, when the ground fixing is usually the weak point.
- Relying on sandbags or water containers alone, when weights should only add to a mechanical fixing, not replace it.[1]
FAQs
It can. Wind can lift, slide or overturn an unanchored greenhouse, and a film cover can act like a sail, lifting the whole structure off the ground.[1]
Yes. Anchors and guy ropes can usually be added around the base of a finished greenhouse without taking it down. If it has already shifted, move it back into place and check that the base is level before fixing it, so it is not anchored out of position.
A ground stake is driven straight down and holds through friction with the soil around it. A screw anchor is wound into the ground, so its thread grips undisturbed soil and resists being pulled straight out.
It depends on where you live and the size of the greenhouse. Permit rules are set locally, so check with your municipal building department before you build, especially for a large or permanent structure.
References
[1] Aosom Canada, Structural Stability of Greenhouses.
https://www.aosom.ca/wiki/greenhouses-stability
[2] Government of New Brunswick, Season Extension High Tunnels.
https://www2.gnb.ca/content/dam/gnb/Departments/10/pdf/Agriculture/SeasonExtensionHighTunnels.pdf
[3] Utah State University Cooperative Extension, Constructing a Low-cost High Tunnel.
https://www.sare.org/wp-content/uploads/Constructing-a-Low-Cost-High-Tunnel.pdf
[4] Aosom Canada, Outsunny 6′ x 12′ x 6.5′ Walk-in Greenhouse, Polycarbonate Greenhouse with Adjustable Roof Vent, Base, Sliding Door, Clear.
https://www.aosom.ca/item/outsunny-12-x-6-aluminum-greenhouse-polycarbonate-walk-in-garden-greenhouse-kit-with-adjustable-roof-vent-rain-gutter~845-540V02SR.html
[5] Aosom Canada, Outsunny 7′ x 12′ x 7′ Heavy Duty Walk-In Greenhouse with Wind Resistance Level 4 and Ventilation Design, White.
https://www.aosom.ca/item/outsunny-7-x-12-x-7-heavy-duty-walk-in-greenhouse-vegetable-seed-growth-tent-outdoor-plant-growing-tunnel-warm-house~1RM56SQ0CB801.html
[6] Manitoba Agriculture, High Tunnel Demonstration Project Design and Set-Up.
https://www.gov.mb.ca/agriculture/crops/crop-management/pubs/high-tunnel-design.pdf
[7] City of Vancouver, Vancouver Building By-law 2019, Division B, Article 9.12.2.2 Minimum Depth of Foundations.
https://free.bcpublications.ca/civix/document/id/public/vbbl2019/1995615990